housemorjim

Friday, November 10, 2006

start posting

11-11-2006
Bangalore

Abheet
project architect

See that atleast one site image with accompanying text on progress on site is uploaded on a daily basis, if ashok cant handle it, let him mail the image to us and we can do the rest

Minutes of the meeting (telephonic or site) are to be summarised and posted

Drawings when released are to be mentioned

any pending drawing requests have to be mentioned on a daily basis

A weekly review on progress on site as against projected progress has to be posted by every saturday (starting today). this can be prepared by Mr. hulbatte.

We are alittle behind schedule on elevational drawings that I had promised this friday, lets rectify that.

i have to revise the roof detail, i will look into it today

have the 3d images u work on today to be posted by evening for my comments

praveen

0 Comments:

Post a Comment

<< Home